Monday, 8 October 2007

8th - 13th October 2007

Monday
0645 Start. An empty run out this morning, off to Newport near Saffron Walden to collect a groundworkers Volvo ECR88 8t machine. They loaded it straight on, and had put the buckets in a quite unorthadox way. They seemed tight enough so I made my way to Bocking, nr. Braintree to drop the machine at a large site where there have 3 other 8 tonners working already. They jump up and run the machine off but the buckets aren't playing ball and end up everywhere. It's not my problem though and they soon get it sorted.


After collecting some keys from another groundworker I head off to Hinxton just by the A11/M11 split.

To load these, a 5.5t Hyundai and a 3t swivel skip dumper.

It's a nice easy load and I'm out the gate again shortly afterwards and headed for Felstead to their yard.





The 3t S/S dumper is coming off but the buckets need to stay on. What you need is a Hiab to lift the buckets out of the dumper. Or failing that some other lifting equipment.

I need the baby one on next.



I managed to find some new ones after one broke last week.

It's about time I stopped for a while so I take a break at their yard before heading off to Wickham Bishops to drop these two off. It's a bit of a maze through the lanes but I find the site 1st go and soon have the machines off. I get out of the way and find a quiet spot to park until I get confirmation of my next job.

Our other driver Norm has been delayed and cannot complete his last collection so I make my way over to Target Plant at Colchester and load a 6t dumper.

Back at our yard, I have to reload it tight to the headboard so I have enough space to get one of our 5t dumpers on the back. They are both chained down nice and tight ready for the morning and I'm off home at 1645.



Distance 315Km

Tuesday
0645 Start. It's a local job this morning and one made easier still by the fact that Bob is taking a Daewoo 130 13 tonner there on his lowloader. - Anyone remember the bloke who demolished the house last year and got done for attempted murder?



Yep, it was one of these that did it. Not sure which though as we got 2 or 3 Daewoo 130's

The site was a turf farm near Maldon, and both Bob and I were unloaded quickly and off to our respective next jobs.


My next job was to call at Brooks Brothers in Danbury, it's a large timber yard tucked away down an unlikely little narrow lane. I'm loading one of their sideloaders a Fantuzzi Mr Whippy or something similar and taking it to their Maldon yard. Their driver loads it on and tells me that he will be at the other end as he is going there to drive it.



It's only a 10 minute hop down to Maldon and I unchain the machine, drop the ramps and get the kettle on and have a brew whilst waiting for the driver. In the end I get fed up waiting and consider getting one of the Maldon sideloader boys to run it off. But hey that's not very adventurous and I've never driven a sideloader before, how hard can it be? Not very it's pretty idiot proof and soon it's back on the ground floor. Matey arrives in his car as I am just about to leave.

Next job is a crap one, clearing building materials from a site in Great Baddow, on the south side of Chelmsford. It's started to rain and then starts to hammer down and I'm stuck out in it keeping my eye on the forkie who is loading up. There's 2 packs of Osma drain pipe, 1 huge pack of electrical duct, a pallet of manholes and two pallets of steel road plates. These are loaded on and I take them to another site at Great Dunmow where they are unloaded in a fraction of the time.






When I was loading they told me I'd got to collect some Hairy Arse fence panels (HERAS) from Generation's yard and take them to a different Gt. Baddow job when I'd done the Dunmow run.
I arrived at Generation's yard at 1200 and I'd just given my load sheet to the yard wallah when their wagon rolls and I'm told they are going to load him first as he's got to go to Beccles. 45 minutes later they forklift 3 packs of panels on in the lashing rain and it takes all of 10 minutes. It's literally 5 minutes from the yard to the site and it's not the best news as there's no forklift on site. No-one wants to handball 80 panels off, but there is another of the groundworkers sites across the road and apparently their forkie will unload me in 10 minutes. 20 minutes later I'm told that the driver is due back at 1330 (now) and will unload. Finally about ten to two he appears and starts to unload. Overall it has taken about 2 hours to load 80 panels and deliver them about 2 miles away.


I am absolutely dripping wet when I get back to the yard, I load this 7t Yanmar ready for the morning and head for home at 1515.


Distance 120km

Wednesday.



0645 Start. No rush this morning as the first job was back at the site in Great Baddow, where the fencing went yesterday and it's only 5 minutes away at the bottom of Danbury Hill. It's a simple unload and I'm off out to Lt. Waltham on the top side of Chelmsford to my next job. I arrive at the yard and call the Landscaper whose machines I'm moving, he's a bit surprised to hear from me as he'd been told I'd be there at 1100. It's not a problem though and he is soon in the yard and we load the 3t dumper and the 'Kermit' Hyundai 5.5 tonner. He's an old acquaintance of mine and we have a good old natter before taking them the short distance to Lt. Leighs.

Last time I moved them, which was the first time he'd had them moved I'd advised him to remove the beacon off the dumper roof before transport in the future. Needless to say we both forgot about it and I found the beacon (intact) in the road just outside the second site.



Back at the yard, there was not much doing so I get the errand boy job and go collecting parts for the fitter in one of the vans. When I get back the boss asks if I'd be prepared to drive Baker's little lorry as their driver was sick. I was unsure if it would have a digi card and no-one there had the faintest idea what I was talikng about. It's only a five minute walk, so I clump round and have a look for myself.



It's got an analogue tacho, so it's OK and after finding out what needs to be done I run it back to our yard to collect my tachos, gloves and safety gear.



Make way for Noddy.

It's a dinky little MAN 8.150, with a Lego crane and a tipper body.



First call is to Travis Perkins in Chelmsford for a tonne of ballast, a few bags of cement and some kerbstones. I get the ballast loaded up the front as I'm doubtful about the capacity of the 'crane', still it's got a better chance of lifting it off the front.


Next up they want me to collect a few bits of Oak from a hardwood company at Gt. Baddow and take it to Shenfield. The oak isn't ready so that job gets scrubbed and I take the rest to the TA centre at Warley next to Ford's HQ. It takes a while to work out how to switch the crane on, where the PTO is and how to set the engine speed but eventually we get it sussed and it's a no brainer to use and lifts the ballast easily and even the jib will extend which surprises me. It's then back to their yard at Danbury to drop off the toy and a short walk to our yard where I reflect on the following.




Having mirrors is a good thing as it extends your visibilty rearwards.



Having so many mirrors that they restrict your frontwards vision isn't so clever.



Being able to do a U-ey in a T-junction is much easier than a 3 pointer.



Nobody gives you any respect in a little motor. No-one flashes you in or out, or lets you through gaps. OK so in a bigger wagon it's hardly a lot better but there's often someone who takes pity on you trying to thread a big wagon in or out of somewhere.



However it was a little bit different and all helps the day pass.



Distance 47Km - Scania / 68Km MAN

Total 115Km



Thursday

0645 Start. It's a cold start this morning and a short run to Bocking near Braintree to load an 8t Kobelco. I'm more lethargic than usual as I have to wait whilst they get the machine ready for me. Unfortunately it's got thick mud hanging off it so I end up digging the worst out so that it doesn't fall off enroute. The site it's going to is in Melbourn, Cambs (where it came from about 2 weeks ago) down this little lane.


They are building some uber posh houses down here.

Not sure what they'll have to say about illegal stoways arriving though.


Unfortunately the job order is the wrong way around today and I have to trail back down to Maldon in Essex for my next load. This over size Tonka toy is a Hydrema articulated swivel skip dumper.

I'm heading off towards Reading, thankfully avoiding the Dartford Crossing which has tailbacks past J27 for the M11. There seems to be plenty of oversize loads being moved about the moment, this was one was being moved swiftly along no bother.

My 4.5 hours was getting close so I stop at South Mimms for a break, I've never seen the place so full. Everyone avoiding the monster queues further round the 25 I expect.

After leaving South Mimms I have a good run round to Reading, it's an old airfield just off the A329M where I'm headed.

These Hydrema's are weird looking things a bit like a combine without the blade. I used to know a guy who had one but he'd never let me have a play in it, todays the day though and I have a little play after I take it off the wagon.



Time is ticking and I leave Reading about 1430 and I really don't want to get stuck in jams or catch the traffic. There's a bit of a slowup where the M25 goes from 4 lanes to 3 up a hill around Watford. The culprit is this big old crawler, being lugged by a big old crawler an 8 leg F12 doing about 20mph. He was so slow that a mobile crane was actually in lane 2 overtaking.


I have a lucky escape with the traffic and arrive back about 1630, I find out about tomorrows adventures and head off home at 1645.

Distance 498Km

Friday.
0630 Start. I'm out on hire today to Hi Reach platforms at Grays. it's a new one on me and I find their yard in an old chalk pit (eventually) Soon after I arrive someone opens up so I back in to the yard and see what I'm doing today.
There's all manner of boom and scissor lifts there and my first job is to load a diesel powered boom lift. It's a 60' lift on this one and it actually weighs over 11t. I'm given a brief demonstration and left to load it myself.

It is going to Sutton in Surrey and I'm fearing the worst of the traffic when I leave their yard at 0820. To my surprise the Dartford Crossing is clear, as are the roadworls and it's a fairly clear run all the way to the site just off the A217. It's an easy place to find, a steel framed building going up. Up I go in the basket and trundle the machine off, it's a weird experience driving something from such a distance. After a 15 minute break I head back to Grays, but one of the tunnels has got a lane out and the queue is back to J2.

Back at the yard there are two jobs that can be loaded together, first on is a little electric boom lift that I have to manouevre out of the workshop. It goes on fine and I go and get an electric scissor lift and follow the same route. This will not go up the ramps on it's own so I am forced to use the winch remote in one hand and the Genie's joystick in the other. After it goes on, one of the blokes there tells me that he could have forked it on if I'd asked.
After the two small one are on I get another diesel boom lift (a 45') and manage to get it on board and inboard.






By the time I'm done it's just after 1230 and I've about an hour left of my 4.5 so I make it to South Mimms for a 1/2 hour break. I'm done there just past 2pm and I'm headed for White City so it's M25 / M1 / A406 / A40 and then I hit the traffic on Wood Lane opposite the BBC. It takes me about 20 minutes to travel the 200yards to Ariel Way and I discover that the site is actually the Westfield development, probably the biggest construction project in London.

After getting told numerous times I've got to go to the booking in office which is round the other side of the site and served by it's own sliproad off the dual carriageway. Eventually I get in to the site and quickly get the machine off before leaving there at 1630.

I've said I can't complete the last job in the city, but I head in on the A40 Westway as it's solid going outbound. There's a lot of phone calls trying to sort the last drop out as they need the machines for the weekend, in the end I decide it's probably just as quick to go and do it and head straight through the middle to get to Mincing Lane off Fenchurch Street.

Luckily I have delivered to shops all over London and even knew the building where the two machines were going and I pick a route that is fairly clear of traffic. Once I get to the site I get the machines off as quick as, but the bloke there is useless and I end up making a makeshift ramp to get them on the pavement for him. I leave him about 1730 and head off for the road home through Wapping and the Limehouse Link Tunnel. The traffic is horrendous all the way from the Link to the A13 at Barking and beyond but I gamble on the A406 and M11 and luckily it's not too bad. Back at the yard at 1715.

Distance 391KM

Total for the week 1439Km

Tuesday, 2 October 2007

1st - 5th October 2007

Monday
In at 0630 for a run down to Hewden at Dagenham where I'm working for today. It's pants weather and bad traffic and it takes nearly a hour to get there again. There's 2 deliveries and 2 collections for today. 1st on the 2nd delivery, a 5t CAT digger & buckets followed by delivery no.2 which is a 3t CAT digger, hydraulic breaker and buckets. It squeezes on nicely and I'm out of the yard at 0800. Luckily today the rain is keeping people inside rather than inside their cars and my journey into central London is as good as you could hope for.

My first drop is between Charlotte Street and Tottenham Court Road. It's not as bad as it sounds, fairly easy to get to Tottenham Court Rd, join it, head north and dive into the back streets. Made easier by my multidrop job from a couple of years ago I only needed check the map to find Chitty St. The machine is soon off and handed over and demonstrated before I'm off back to Tottenham Court Road and left headed out past Paddington onto the A40 elevated for drop no.2 at Uxbridge.

The address is Hanson Premix, Skip Road. Good name for a place with loads of refuse companies down there. The batching plant is at the end of the lane and is awash with a 2" thick sludge of water and mud. This goes everywhere as there is a whacking great shovel buzzing about, and the truck is covered.

The load is off and I head out on the A40 / M40 and pick up the M25 stopping for 45 at South Mimms about 1130. My collections are both in the same place in Silvertown, London E16 in the yard of Edwin Shirley Trucking - You rock we roll. The first thing to go is a 6t dumper and it's driven on chained and quickly run back to Hewden's yard before turning around and heading back for the next bit. Collection 2 is a 13.5m CAT Telehandler a TH560, there's also an 8t CAT digger from Hewden's but a driver from Peterborough turns up to collect it as it was hired from there!
The tele is loaded on, tightish up to the edge of the body as usual but when I get out the other side is well overhanging, so the American fat boy comes off and is loaded right up to the edge. It's all on and chained when I spot that the O/S Axle 3 tyre is looking pretty flat. I pump the air back into the body which improves things slightly but it's screwed. I found an airline with tyre inflator but that was crap so the tele comes off, the axle goes up and I run back to Chelmsford empty. The tyre is shot, it was on the last of it's tread anyway so a new one is fitted on the way to the yard before finishing at 1730.


Distance 306Km


Tuesday.
Another 0630 start this morning off to a farm near Kelvedon to collect our EX60 that has had some welding done on the dozer blade after a hirer nearly ripped it off.

It's only a 6 tonner but it's a good old workhouse and has got a similar size cab to our 13t Hitachis. Better than the zero tail swing newer models for sure. It's just the machine, no breaker or buckets so it's an easy move back to the yard to offload.

Next it's off to Greenshields JCB dealer at Braintree, to collect a new 531-70 telehandler destined for MAP plant at Barking. Extra care is taken to chain it down as they have had a reputation for being a bit picky and I'll try and keep as much paint on it as possible.

Although it does the job I don't usually chain across the tow pin, those ovalish slots are the tie down eyes that I'd run the chain through. I don't subscribe to using straps like they do when they come from the factory, they have chain eyes so I'll use chains. Sooner or later someone will, so it may as well be me, after about 2 days on hire it'll be scuffed up and probably have lost a mirror or lens. It's plant, built to work not to stay shiny. MAP's yard is right next to the flyover on the A13 (by mustdestroy.com) and is another poxy place where you have to reverse in from the road.


Things have worked out OK as a quick run down the A13 to the NCR junction and I can nip through Docklands to EST's yard to collect yesterdays tele. Yesterday the yard seemed full, today it seems fuller although everything seems to have moved overnight. No matter there's a gap to squeeze in and load and I'm soon chained down and off out of the gate back to Hewden's at Dagenham.




Ah, you've got the big one they say when I get to the yard. Although not the biggest (it's a 17m lift) this one is a 13.5m high 5 tonne machine and weighs in at 13.5t which explains why the tyre was looking fairly flat. You'll notice the straps on the front, this is because it has small chain eyes that I can't use. I have discovered that talking to the fitter whilst unloading is a bad thing as when I got in the machine it wouldn't engage reverse properly. It's not uncommon with these electronic controls so when it still doesn't respond aften knocking into neutral and back I give it a bit more power. BANG - WTF? Ah yes I'd forgotten to take the short strap off the nearside. It had ripped it apart and fired the handle across the yard. Oddly enough it seemed to move nicely now.

After a 45 minute break near Rainham (Essex) around 1230 I'm off over the water (Thames) to Kent to the Skanska site where they are building a new A2. This is the beast I'm collecting, it's fairly uncommon a JCB 4CX the big brother of the 3CX. It's largely the same but has interchangeable bucket / loading forks and has 4 massive wheels that all drive and steer. It's absolutely caked, the pictures don't do it justice really and a fair amount ends up on me.


This is a small selection of the heavier plant, the 14t duck is quite small here on this site as 20-22t 360's are the norm although there is a 65 tonner a bit further along. There was about 10 of the CAT trucks parked up and a larger bulldozer just out of shot. And a big grader too. Big boys toys here.

The 4 CX is taken back to the contractors yard at Braintree where it is going in the workshop for a few days. It leaves a mountain of mud behind which is duly swept off in their yard before I head back to Danbury. I'm back by 1600 and off home by 1630.
Distance 349Km

On the way up the M11 I got overtaken by a R530 Topline 6x2 rear lift rigid. It was a bit over top with lights but the twin stacks looked good. I thought I was doing well at 420hp but 530? for what's effectively an 18 tonner half the time, it didn't even have a drawbar coupling either. Yes please that'll do me.

Wednesday

0645 Start. I've got a passenger this morning, the proud of owner of a new (to him) tractor that we are collecting from the Cambridge auction site. I've never been to the auctions here so I just go where I'm directed and am slightly surprised to find the Cambridge auctions at a place called Sutton, about 4 miles west of Ely. The sale was on Monday and much of the stuff has gone already, but the place was still stacked out with tractors. Hundreds of the things and a fair bit of plant too.


There were about the same number of 3CX's behind me.
Just one of numerous lines of tractors.



We'll take this one an E reg MAssey Ferguson 3070.



My man was happy enough and we trundled back down to Essex and dropped it off at his farm at Purleigh near Maldon. My next job was a collection at Layer-de-la-Haye near Colchester and I'd got 40 minutes left on the clock before needing a 45. Will I? Won't I? With 5 minutes to go and about 5 minutes to the site I decide that if the site was too small I'd be screwed so I have a peaceful break on the causeway at Abberton reservoir.

After lunch I head into Layer and load a 1t skiploader and our Komatsu 27R 3t minidigger, I can't be arsed to take the windy road back through Maldon so I cut through the south of Colchester, past the zoo and out to the A12.

Passed this beast on the A12, It's a Hitachi ZX 470 with a long reach boom. Ordinarily it'd be clclassed as a 50t machine but with the long boom it's anyones guess. Either way it was very heavy, very long and very shiny and being dragged by an 8 leg Scania unit.

Back at the yard the 27R comes off. Followed by the skiploader. Tip the buckets out. Skiploader back on.

Followed by a Hitachi ZX 50, just a tiddler it's a 5 tonne machine. I'm back down to Purleigh to drop this at the side of the road where the water board are trying to mend a water main. Then it's round the corner to Lavenham Plant at Cold Norton to offload the skiploader. Somehow there seems to be an overload of work and I am now heading off out rather than back to the yard. Next call is to a place called Bobbingworth it's just off the A414 near Ongar and I'm collecting a roller for CRH plant. It's a winch job this one as it's a towed roller.

It's also bloody massive and weighs about 6t. What you need to pull it is a CAT D6, which deliver the thing to the bottom of my ramps. The winch isn't the best of things with anything on it and progress was painfully slow, in fact I'd probably still be trying to winch it on now but for matey in the D6 giving it a shove. I had to keep my eye on him as he'd have probably driven it straight on the back. I set to with the chains and chained the back down as tight as I could, then did the same at the front. Right that's secure I'm off. Despite the chains being solid the roller is seesawing up and down and the ride is choppy to say the least. Imagine driving an unbaffled tanker that's half full down a bumpy ride and you'll get the idea. It's only a short hop to North Weald where I stop to collect a 1400mm self propelled roller. I now get the ratchet straps out and pull the back of the big roller mega tight, surely now it can't move. There's a noticeable improvement on the howeward journey but it's still rocking slightly. Back in the yard at 1730 and off home by 1745.


Distance 436Km


Thursday.

0645 Start. First job was to get shot of the rollers at CRH plant at Witham, the Bomag 140 was easy as I could drive it off, but the big boy had to be dragged off with a dumper and held with the winch.



Tucked at the back of the yard was the sad remnants of a 2CX


With the rollers gone it's off to Braintree to load the 4CX to go back to the A2 in Kent.


It's not my week for equipment, this happened when I tried to tension the chain.


This guy gets to use lane 3 on the motorway. FAST and with 2 police cars as escort on blue lights and another about 1/2 mile ahead. One escort tails and one runs alongside. Everyone gets out of the way. I've only ever seen it on the M11 I reckon it's cash from the Bank of England print works at Loughton. Could be bullion I suppose but I reckon cash is more likely.
(Friday - As I was heading into London on the A11, there was a police convoy of three cars escorting an old (J reg or so) Seddon Atkinson 6 wheeler, same dark blue unmarked) they were bocking side roads and making a right noise about it. True to form though, I saw the Sed. quietly trundling on its own back down the M11 south of Loughton when I headed back out)

What I didn't see and will probably never hear the end of is RobK going the other way on the M25 and flashing and waving like a man possessed. I shall now wave at everyone going the other way to avoid offending anyone else. I'm very sorry everyone. I feel like I've let you all down.

It's a clear run down to Skanska on the A2, drop the 4CX and stop for a break before heading back to Essex. Despite the doom and gloom on the matrix signs, I get this close to the toll booths for the tunnel.



Where possible I always use the right hand tunnel, it's bigger and you haven't got to start lane changing when you come out the other side.


A short hop up the A127 to the next job at Romford. I hate these jobs loading bricks, blocks and building materials.


Well when I say loading, I mean someone else loading.


Saw this at Gallows Corner, now I'm a big mini (if that makes sense) fan and it's taken me a while to like the BMW version. But this is just crap, complete with matching pink alloys. Well it is Romford.


Back up the M25/M11/A120 and I'm site at Braintree. A nice big site with loads of space to take materials. Sadly it's just 4 packs of bricks here.


That I have to unload. Or more precisely have to be unloaded.

The rest of the stuff goes to a poxy site in the middle of South Woodham Ferrers. It's an absolute arse to get down the road to it, there's nowhere for the forkie to drop the stuff and getting out is also a nightmare.



But I'm eventually out and back across to Purleigh to collect the ZX50 from yesterday. It's right on a T junction with a busy road and nowhere to stop, so I have to get right over into the hedge to load.


Back at the yard there's a bit of a space issue, there's a mixture of everything we've got in at the moment. 1.5t / 3t / 5t / 6t/ 8t / 13t wheeled and tracked excavators.


3 lorries.


And one of our 20t ZX200's. There's also some dumpers and a bunch of vans that are spare or waiting for scrap. Come Monday it'll probably all be out. Hope so or we'll be in real trouble if any of the others come offhire. We'll be taking it home I reckon as we must be at capacity.


Distance 316Km

Friday.
0630 Start. Off to Hewdens at Dagenham again this morning and a much better run down the A12 than the last couple as there's no delay at Brook Street. I'm only on a half day here today so it's not the usual yellow pages size sheaf of delivery notes and collections waiting for me. 2 deliveries and 2 collections is all I've got and I load the two diggers, a 1.5t and a 3t easily.



I'm a regular at Hewdens, almost like their staff driver. Might be something to do with the fact that the driver of this left about 2 months ago and hasn't been replaced yet.


Oh, and about 4 months they got a brand new truck delivered and were going to get a second driver. They never did and this has never left the yard.


First drop was in E1 just off Whitechapel Road. Trouble is once you turn off there are lots of narrow one way streets. You just have to keep going and hope for the best.

Next is the first collection, another 3t digger and a hydraulic breaker tucked away in the corner of a site in Canning Town (or Cannnnin Taaaahn)

It goes on the back and I trundle off to Hewdens at Waltham Cross where I have to unload it, unload the 1.5t which is staying there and load the 3t back up the front. Then it's off to Rainham (Essex) to for the second collectionwhich is a CAT TH330 Telehandler. It's a bit bigger than I was expecting so a bit of nifty thinking later and the digger is slewed at 90 degrees to its tracks and the offset boom swung round to nestle inboard. Sometimes I surprise myself.

It's a short hop back to Dagenham to unload. Just in time as another hire firm pulls in in front and are there to collect their breaker. That's my lot for Hewdens for today, time to start working for Danbury. Back at the yard I manage to get in but have to start shunting stuff about to make space so I can load. This duck is right in the way, but until I load my machine there's nowhere for it to go. But that's what I'm paid for, to overcome these little challenges and I'm off out loaded with a Hitachi ZX75 for the amusingly named.................


It's gotta go in a field so it has to be offloaded in the road.



Obviously round here the local posties are hardcore militants.

It's then back to the yard for the final time this week. All finished by 1700 and a 52.5 hour week.
Distance 271Km.